In today's world, businesses need to build software faster to remain competitive and adapt to changing market demands. IT companies and their technical teams are constantly pressured to accelerate software development. Companies need to meet strict deadlines and reduce time-to-market to get ahead of the competition and not to lose their market share.

 

Then, they have to quickly adapt their products to changing conditions and requirements. The competitive global industry also requires that they consistently increase product quality while decreasing costs. Fast software development not only reduces time-to-market but also ensures cost efficiency and better resource utilization.

 

Attempts to speed things up will most likely impact the other aspects, but luckily, certain best practices can help you ensure high quality while accelerating software development. For instance, many established companies and startups resort to offshore outsourcing to speed up app development.

CUSTOM SOFTWARE DEV

Want to develop software faster without sacrificing quality? Let Onix show you how.

SEE HOW WE SPEED UP DELIVERY
iconImg

If you are reading this article, you may be one of those entrepreneurs. Even if your current software development process goes smoothly, there is always room for improvement.

 

If not yet, read on to learn how to develop software faster and better with your future outsourcing partner. Our advice is based on Onix’s experience in delivering custom software solutions since 2000.

Table of contents
  • Factors that Impact Software Development Speed

  • Sprint vs. Marathon Mindset in Software Development

  • How to Speed Up Software Development: 11 Tips to Follow

  • How to Reduce Software Development Time

  • How Onix Can Help Accelerate Your Software Development

  • Summing Up

  • FAQ

Thus, let's start with some of the factors that cause project delays and increase time-to-market in software development.

 

Factors that Impact Software Development Speed 

 

Project complexity

Every problem the team encounters reduces the speed of development. They can result from:

 

  • Technical complexity. These technical and design challenges may be related to complex software architecture, third-party integrations, innovative solutions, etc., as required by the target audience’s needs, the load the system should sustain, the number of users, and other factors.

 

  • Requirement complexity. The clarity of requirements promotes faster software development, whereas difficulties with understanding the project requirements and business objectives have the opposite effect.

 

  • Deadline complexity. When the estimated project time frame does not match the actual scope of work, unrealistic deadlines put additional pressure on the team, may cause hasty decisions, neglect of quality assurance, and other problems.

 

  • Structural complexity. When too many stakeholders, workflows, resources, and other components are involved in product development, they become more difficult to coordinate, manage, and control, thereby reducing the speed of software development.  

 

Increasing complexity hampers the development process, requires additional skills and resources, and makes it difficult to spot and fix bugs. When tasks pile up and the team members feel overwhelmed, they make more errors. The more problems the team encounters, the lower their software development speed. 

 

Product development team’s size, skills, and morale

The team’s overall performance depends on each team member. For example, insufficiently qualified personnel can make mistakes that cause software project delays. If everybody is skilled, experienced, knowledgeable about the project’s subject, motivated, and collaborates with everyone else, they can do the job faster.

Communication Strategy for an Offshore Team

10 Tips to Provide a Communication Strategy for an Offshore Team

read now
iconImg

Unrealistic deadlines and poor management may lead to overwork. When multitasking goes up, productivity goes down. Even a great developer, if forced to code for 10+ hours daily, may do more harm than good at the end of the day.

 

The company will have to pay extra for overtime, when their productivity is much lower than during normal working hours. Finally, exhausted programmers may decide to quit just when you need them most. 

 

Hiring more programmers may hardly speed up software development process. New team members, especially junior developers, will take a while to onboard and train, diverting existing team members from their work. 

 

Even after that, your new development pace might disappoint you due to more complicated internal communication and management associated with bigger teams.

 

Code quality

The development pace and code quality are a two-way street. If a company’s quality standards are high, they usually are okay with a relatively time-consuming process.

 

If a team has super tight deadlines and too many tasks to complete in a sprint, they may rush the process by taking shortcuts, neglecting code quality, and skipping tests. Poor code with bugs will require fixing issues and rewriting parts and features later, affecting the speed of software development. 

 

On big projects, minimizing proper planning and analysis, code reviews, or testing for the sake of faster iterations may jeopardize the project’s progress in the long run.

 

Scope creep

Even a seemingly small change in scope may result in increased system complexity and require the revision of the entire architecture and adjustment of the design. The majority of projects expand to some extent, and the management of changing requirements is integral to Agile methodologies.

 

Naturally, the development of more features will consume more resources or time. Most entrepreneurs are aware of this.

 

What teams should avoid is uncontrolled expansion of product or project scope, when more features and requirements are added than originally planned without adjustments to time, cost, and resources. Their work speed will be affected, most likely quite badly, if the requirements change too frequently and not all changes are discussed with the team and recorded properly.

fast software development

Addressing these factors is the first step to accelerating software development without compromising product quality. The following chapter offers more advice. 

 

Human factor

The human factor is one of the most important factors that can impact the speed of software development. The people involved in the development process play a vital role in determining how fast or slow the process will be. Factors such as individual skills, experience, and work ethic can all influence the speed of software development.

 

Another important factor that can impact software development speed is the level of communication between team members. If team members are not communicating effectively, it can lead to delays and errors in the development process. Effective communication is essential for fast and efficient software development.

 

If the team adheres to ethical standards, they will be more likely to produce high-quality code that contains errors. This can save a lot of time in the development process as less time will need to be spent on debugging and testing.

 

Sprint vs. Marathon Mindset in Software Development

In software development, there can be a sprint mindset and a marathon mindset. The sprint mindset is when developers work fast and hard to get a project done quickly. The marathon mindset is when developers take their time and work on a project over a long period of time. Both approaches have their benefits and drawbacks.

 

The sprint approach is good for getting things done quickly. It can help to meet deadlines and get products to market faster. However, the downside is that it can lead to lower quality products and more bugs.

 

The marathon approach is good for ensuring high-quality products. It can also lead to better code that is easier to maintain in the long run. However, the downside is that it can take longer to get products to market.

 

Ultimately, it is up to the developers and the project managers to decide which approach is best for each individual project. Both approaches have their merits and it is important to choose the one that is best suited for the task at hand.

 

How to Speed Up Software Development: 11 Tips to Follow

There are many ways to speed up software development on your outsourced projects. You can look for specific terms on vendors’ websites and programmers’ CVs when hiring. You can also interact with the team in certain ways and require that they follow certain best practices. Whatever your situation, we hope the following tips will be helpful.

 

1. Measure to improve

We at Onix love metrics: we can improve only those things that we can measure. Before trying to accelerate software development cycles, scale your team, or improve your app’s or website’s design, it’s important to understand where your project currently stands.    

 

Analyze various data and use specific criteria to assess your present situation. Set your goals and after implementing chosen best practices, compare the results with what you expected.

 

For example, many developers and project managers (PMs) measure performance in lines of code. 

 

We use team velocity as a more Agile way to measure software development speed. While performance, a related metric, is primarily concerned with doing work faster, velocity is about providing value without sacrificing the quality.

 

Basically, it measures the team’s overall performance and productivity based on the volume of features or user stories delivered within a given period, such as a two-week sprint typical for Scrum.

 

2. Proper planning

Onix provides product discovery services as the first step of the software development process. Its deliverables may include a step-by-step project plan, specifications, mockups, and other prerequisites for smooth and timely product development. This will help you and your team share clear goals and project scope. 

 

Understanding its complexities, potential challenges, and risks, the developers will be prepared to tackle them and avoid delays that can slow down the speed of development.

product concept

Get technical validation of your product concept before spending a lot of money!

learn more
iconImg

Another approach that speeds up product development is to start small and steadily progress through multiple stages or iterations. Namely, we recommend building a minimum viable product (MVP) before taking a deep dive into end-to-end product development. Many feature ideas may prove to be failures immediately. 

 

Moreover, end-users typically use only up to 20% of a product’s functionality, so it’s not only easier and faster but also reasonable to plan the development of that minimum first. 

 

Refrain from including in the MVP top-notch features unless they are integral to the end goal. Build and release it quickly, and, based on the feedback from the focus group and business analysis, continue development in a chosen direction.

 

 

Afterward, multiple quick iterations and releases will help you perfect your product and hopefully reach the product-market fit for your SaaS startup faster.

 

Planning also relates to everyday work. For example, too many concurrent tasks complicate things and overwhelm the developers. Managers advise limiting work in progress, i.e. setting the maximum or the minimum of work to do, at each stage of your workflow. 

 

It’s crucial to analyze the employees’ maximum workload capability and enable them to stay under that level as much as possible. PMs using the Kanban boards may specify the maximum number of tasks allowed on each column.

speed of software development

Working with small components increases teams’ overall productivity in the long run. Divide overwhelming pieces of work into smaller manageable chunks and large teams into smaller dedicated groups to solve specific problems. 

 

Semi-autonomous cross-functional units that can make their own decisions will ensure that at any time, some part of your project is being built. Combined with systematic tests and integration, this approach lets the developers reach their goals faster.

 

3. Develop a clear roadmap

Team members who share a clear understanding of the project requirements and goals, knowing exactly what to do and when to do it, can save loads of time avoiding discussions and meetings they generally don’t need.

 

Create a clear and concise roadmap of the entire project and discuss it with the team before the development process begins. Knowing your business goals and your criteria of project success, they will be able to determine the key performance indicators and metrics to track.

 

4. Have a balanced team and keep it small

Avoid assembling big teams. On a large project, split bigger teams into smaller groups that work on project components independently. Teams of 3-7 people are generally regarded as an optimal size and more productive than bigger teams.

 

It is also important to support the correct ratio of back-end and front-end developers, quality assurance (QA) staff and developers, and senior developers, regular, and junior developers with the necessary competencies.

 

If the majority of your team are senior developers, the team may end up endlessly debating whose approach or solution is better. Conversely, a team made up of primarily junior developers will likely not be as productive on a complex project as they lack the skills necessary to solve issues and the experience in overcoming various challenges.

 

The optimal team composition, say, for six developers, is two seniors, two regulars, and two juniors. The team is sure to get tasks with various levels of difficulty. Some may be challenging even for seniors, but others will be just right for junior devs.

 

Seniors will draw satisfaction from practicing and enhancing their skills, while others will be able to learn and receive help when needed. The team’s morale will most likely go up.

 

External staff augmentation allows organizations to quickly find specialized talents or even a whole team for a particular job. 

 

For example, Onix forms balanced dedicated teams, including highly qualified specialists, to meet any project’s requirements.

dedicated development teams offer

Do you know what advantages dedicated development teams offer?

learn more
iconImg

Entrepreneurs who are new to software development sometimes neglect QA and do not want to hire testers. However, testing is essential, not only to the product quality but also to product development speed. We recommend having one tester for every three developers in a team.

 

It’s also recommended to include a Product Owner, even at the expense of one of your developers.

 

A dedicated PO will be the guardian of the essential rules of software development, take care of the backlog, realistically plan out what should be done and what could be done, assign tasks, act as the single point of contact between you and the technical team, and more, which will consequently affect development speed. If you cannot hire an experienced PO, your PM should try to take over these functions.

 

 

5. Your team should test early and often

Quality assurance should permeate the entire software development lifecycle (SDLC). For example, our customers are sometimes surprised by the news that testing has begun along with or before programming: the QA staff have to describe cases, prepare test documentation, and more.

 

At some point in your project, adding new features may become increasingly difficult, because spotting and fixing bugs will be consuming most of the team’s time. Testing automation can help prevent this situation, catching major bugs early in the SDLC, long before they reach the manual tester. This improvement can help you save much time and effort.

 

This must be planned and executed from day one: catching up and covering your product with automated tests after it’s built is also very time-consuming.

 

At Onix, we conduct all types of testing, including unit testing, integration, weighted regression, performance testing, and more. 

 

6. Choose a partner or team that practices Agile methodologies

Agile methodologies come in many forms, but the goal is always the same: integrate rapid iterations and feedback with continuous planning, testing, and integration for the continuous evolution of the project and the software. Onix embraced Agile to add to our development process more flexibility, speed of development, and quality.

 

The emphasis is on delivering working software to users as quickly as possible using recurring short development cycles. For example, in Scrum, a development cycle (sprint) typically encompasses two weeks in which the team focuses on building a specified set of deliverables. This ensures flexibility and adaptability when priorities change with every sprint. 

 

The Lean approach implies optimizing development time and resources, focusing only on what the user really needs. To move quickly and efficiently, your team should build software in small increments, get user feedback as early as possible, and make the necessary adjustments promptly.

 

Here are more tips to speed up software development processes:

 

  • Reduce meetings. For example, daily meetings consume time, but team members often end up discussing items that don’t add value to the project. Many topics can be handled via emails or messages between just two people.

 

  • Eliminate dependencies, such as relying on other teams, services, or implementation applications to speed up programming. At the early product discovery, the developers or software architect should provide the technical perspective to your situation.

 

  • Once the dependencies are clear, the PO should prepare a backlog where the team can pick up tasks on their own to deliver value after each iteration. It’s best to prepare product backlogs for upcoming sprints or weeks. During that time, the PO can work ahead of the team to prepare new features or talk to stakeholders to get their feedback.

 

7. Opt for continuous integration and deployment

Implementing CI/CD pipelines is a proven way to achieve faster software delivery, ensuring seamless updates and reduced downtime.

 

Ask your team whether they use CI/CD pipeline. Continuous integration (CI) is the practice where every developer merges (integrates) code changes into a shared repository several times daily or weekly. Each check-in is verified by an automated build, allowing early problem detection. 

 

The idea is to build and integrate the software as frequently as every code check-in. CI enables automated testing and decouples software builds from software deployments.

 

Continuous deployment or continuous delivery (CD) is the practice of automating the software release process.

accelerate development timelines

The CI/CD pipeline is the backbone of modern DevOps operations, which is the key to high velocity. For example, its implementation helps Onix’s teams accelerate development by eliminating manual errors, providing instant feedback, and enabling fast iterations.

 

Some good practices for software development teams include:

 

  • using trunk-based development
  • relying on automated processes
  • frequent deployments in small increments
  • prompt fixing of broken builds
  • unit-testing automation

 

8. Communicate with your dedicated team regularly

Actively engaged stakeholders help improve collaboration and reduce risks, whereas miscommunication between the client and developers slows down the development process. When the technical team does not get answers to its questions in a timely manner, they can halt or proceed further at their discretion, which can lead to mistakes and conflicts. 

 

Task management, meetings, and workflow discussions can be optimized. You can save at least an hour per day by implementing an app like Zapier to automate repetitive tasks.

 

Make sure to ask the PM to send you regular reports: this will help you stay in control and monitor timelines.

 

Feedback also helps improve team velocity, if it’s done right. You need to be honest, even if that means causing disappointment or anxiety. Sometimes, you may need to shake up an underperforming team by reminding them of their responsibilities, but without being mean or abusive toward your team members.

how optimize offshore team

10 Tips to Provide a Communication Strategy for an Offshore Team

read now
iconImg

9. Require solid product documentation

Every project should be documented, including how the product has been developed, the supported features, any problems, etc. Investing some time in documentation upfront will help speed up the development process in the long run, especially if the product is growing.

 

For example, Onix’s PMs usually assist clients in creating all required documents with core project requirements and details to implement. 

 

Solid product documentation helps track the project’s progress and onboard new team members. It also helps everyone involved stay on the same page. If stakeholders have a question, they can consult with it instead of asking and interrupting the programmers or PM.

 

10. Avoid long work hours

Working long hours is often touted as the key to success in the software development world. However, new research suggests that this may actually be counterproductive.

 

A study found that developers who worked more than 55 hours per week were no more likely to complete their projects on time than those who worked 40 hours per week. In fact, they were actually slightly less likely to meet their deadlines.

 

The study also found that developers who worked long hours were more likely to experience burnout and job dissatisfaction. They were also more likely to make errors and have lower-quality code.

 

So, if you want to develop software faster and better, it’s important to avoid working long hours. Instead, focus on working smarter, not harder. Establish efficient processes and make sure your team is well-rested and healthy. This will help you avoid burnout and improve the quality of your software.

 

11. Circumvent technical debts

Technical debt is one of the most common causes of delays in software development. By taking steps to avoid and circumvent technical debt, you can speed up your development process and improve the quality of your software.

 

There are many ways to avoid and circumvent technical debt. One way is to use automation tooling to automate away repetitive tasks. Another way is to use best practices and design patterns to improve the quality of your code. Finally, by using refactoring techniques, you can improve the structure of your code and make it more maintainable.

 

How to Reduce Software Development Time

 

1. Modularize your codebase - breaking your codebase into small, manageable modules will help you work faster and more efficiently.

 

2. Automate wherever possible - automating tasks will free up time for you to focus on other areas of development.

 

3. Use the right tools for the job - using the most appropriate tools for the task at hand will help you work faster and more effectively.

 

4. Simplify your process - streamlining your development process will help you eliminate unnecessary steps and work more efficiently.

 

5. Focus on quality - taking the time to ensure that your code is of high quality will save you time in the long run by avoiding rework and debug time.

 

How Onix Can Help Accelerate Your Software Development

We're a fast-paced company that can help you accelerate your development timelines and get your software products to market faster. We have a team of experienced developers who are familiar with a variety of programming languages and tools, so we can quickly adapt to your project needs. 

 

In addition, we use an agile development methodology that allows us to rapidly prototype new features and iterate on existing ones. Onix follows the Agile methodology and employs Lean Inception practices to accelerate the development process and deliver high-quality software quickly. To learn more about our successful project, check out our portfolio with case studies. 

 

Summing Up

Software development speed directly impacts the product release date, cost of development, and ultimately its chances for success. To achieve accelerated software delivery, businesses should adopt DevOps practices, enabling seamless integration, deployment, and faster software delivery cycles.

 

Opt for Agile software development and DevOps processes that accelerate software development speed and can positively affect the other factors. Start small but plan strategically. Document the product requirements, but be prepared to make changes. Communicate regularly and monitor and optimize your processes throughout the duration of the project.

 

Are you looking to create a digital product or enhance your development team to accelerate time-to-market and boost efficiency? At Onix, we offer flexible access to expert specialists or dedicated development team services, tailored to meet your project needs. Whether for short-term assistance or long-term collaboration, you can rely on us to deliver top-quality services quickly and at a competitive cost.

Agile software development

Gain valuable insight into your future product

contact us
iconImg

You can rely on Onix’s:

 

  • Agile approach
  • Highly skilled and experienced developers
  • Vast experience in outsourced software development in various industries.

 

We oversee the entire recruitment process and project management. Contact Onix today!

 

FAQ

 

How to deliver software faster?

 

1. Define what "done" means and track progress accordingly

2. Use a Kanban or Scrum board to visually track progress

3. Set realistic goals and sprints

4. Cut down on unnecessary meetings

5. Automate repetitive tasks

6. Use continuous integration and delivery

7. Improve communication and collaboration among team members

8. Use the right tools for the job

9. Keep things simple

10. Be flexible

 

Is it possible to speed up development without losing quality?

The answer is yes. There are various ways to speed up the software development process without sacrificing quality. By following the tips in this article and by working with a trusted technology partner, you will get a high-quality product at a time. 

 

Is it possible to accelerate the software development process via outsourcing?

When done correctly, outsourcing can be a great way to speed up the software development process. It is important to do your research and make sure that you are working with a reputable company or individual, and to set realistic expectations for the project timeline.

Written by:

executor photo

Denis Sheremetov

CTO at Onix

Development of custom solutions for all sizes of businesses. Ensuring efficient and secure technology use.

Volodymyr Perepelytsia

Volodymyr Perepelytsia

Head of Business Unit

Related articles

Outsourcing

blog-image

Best Practices for Outsourcing Software Development in 2026

Here you can learn how to outsource software development step-by-step, avoid mistakes, and promote the best outcomes for your business in the long run.

author

Serhii Kholin

Dec 16,202519 min read681 views

Outsourcing

blog-image

Pros & Cons of Software Development In-House vs Outsourcing

If you wonder whether to build software in house or outsource the job, here are the advantages and disadvantages of both options to help you decide what fits your business needs best.

author

Serhii Kholin

Apr 18,202518 min read447 views

Software Development

blog-image

7 Best Software Development Models and Methodologies

Explore top software development models and methodologies with real-life insights from Onix. Learn how to choose the right model for your project's success.

author

Serhii Kholin

Mar 07,202412 min read710 views

Outsourcing

blog-image

How to Outsource Web Development Projects in 2026

Discover how to outsource web development projects in 2025 effectively. Learn key strategies, benefits, and tips to choose the right tech partner for success.

author

Serhii Kholin

Jan 08,202610 min read1184 views

Software Development

blog-image

POC in Software Development: Driving Innovation

Discover the benefits of MVP and proof of concept in software development. Test your product ideas with Onix quickly, cost-effectively, and confidently!

author

Serhii Kholin

May 22,202313 min read249 views

blog-image

How to Determine & Prioritize Features For MVP

Discover the top methods for prioritizing MVP features to ensure your product's success. Learn proven frameworks, avoid common mistakes, and focus on user needs with expert tips from Onix.

author

Serhii Kholin

May 29,20239 min read322 views

subscribe-bg

Join us now and get your FREE copy of "Software Development Cost Estimation"!

This pricing guide is created to enhance transparency, empower you to make well-informed decisions, and alleviate any confusion associated with pricing.

Your Name*
Work Email*
Company*

In this guide, you'll find:

Factors influencing pricing

Pricing by engagement type

Price list for standard engagements

Customization options and pricing

Pricing by product

call_to_action_bg

Tell us about your product idea and let the magic unfold.

© 2000 - 2026 OnixPrivacy Policy
GoodfirmsRightFirmsTechBehemoths Verification

Contact us
newprojects@onix-systems.com
We are hiring
hr@onix-systems.com

SERVICES
  • VR/AR Development
  • AI Solutions Development
  • 3D Art Services
  • iOS Development
  • Web Development
  • UX Audit Services
  • Software Project Rescue Services

INDUSTRIES
  • Travel and Hospitality Software
  • Sustainable Travel Development
  • Online Scheduling and Booking
  • Healthcare Software Development
  • Fintech Solutions Development
  • EdTech Software Development Services
  • Sports & Fitness App Development
  • Custom LMS Development

ONIX HEALTH

ONIX AUTOMATION

HUMAN AUDIT

UX AUDIT

company
  • The Onix Story
  • About Ukraine
  • Referral Program
  • National Holidays

Case Studies

Design portfolio

Blog


Travel
  • How to Build a Travel Mobile App: Features, Tech, and Costs
  • Travel APIs: Types, Benefits, Best APIs &How to Choose
  • How to Choose a Payment Gateway for Travel Businesses?
  • Why and How to Build an Automated Travel System in 2025
  • Travel Fraud Prevention: Protect Your Business
  • A Travel Business's Guide to Seamless Migration

Healthcare
  • Healthcare CRM Development: Key Features & Cost
  • AR & VR in Medical Training: Use Cases & Implementation
  • MVP in Healthcare: How to Execute, Costs, and Major Milestones
  • How to Develop a Telemedicine App: Tips, Features & Costs
  • CRM Insurance Software Features
  • Why and How to Achieve Interoperability in Healthcare IT

AI Development
  • How AI is Transforming CRM – And What It Means for You
  • Hand Tracking and Gesture Recognition Using AI
  • Biases in Artificial Intelligence: How to Detect Bias in AI Models
  • Deepfake Threats: How to Protect Your Business?
  • AI Agents: Examples, Use Cases, and Development Basics